Taking NATE Online
We have recently begun teaching our NATE classes online using zoom format. This article will hopefully clear up some of
Technical Services Manager
North Georgia District
We are finding ourselves with more and more VRF components that will require maintenance periodically. Example: a 40VMF
Below are the procedures of handling one of the components mentioned above. As always, please take your time and use precautions in all work you perform.
1) This is the location of the condensate pump in relation to the control compartment
2) Remove all screws from the four corners indicated by the arrows
3) Remove the 3 screws to remove wire routing cover.
4) Remove the felt tape covering the wire route
5) Trace the pump high voltage wiring harness to the control compartment
6) Unplug the 2 black wire connectors from the pump connector on the control board and unscrew the green ground wire from the control compartment
7) Trace out the pump float alarm cable. Notice that it runs under the control compartment and will require taking the control compartment screws out. Let it hang down so you can access the wire all the way over to the wire bundle on the right side of the control compartment.
8) To remove the control compartment first cut the wire tie holding the wire bundle together.
9) Next unplug the red and black 2 wire plug from the water connector on the control board
10) Once you have both cables disconnected remove them from the wire route in the bottom of the foam drain pan.
11) Next you pull the drain pan down about 2 to 3 inches all the way around the unit. You will then be able to pull the condensate pump side down about 10 inches.
12) You will then be able to access the pump Assembly which can now be removed by removing the 3 mounting screws.
To complete the replacement, install the new condensate pump assembly and reverse the previous steps.
We have recently begun teaching our NATE classes online using zoom format. This article will hopefully clear up some of
Coming back to work after an extended weekend of 4th of July there’s paperwork handed to you for the emergency
Carrier has approved the use of Crossover equipment with zoning applications. The instructions for this will be released in several phases during 2026. Release dates for
We use cookies and other tracking technologies to collect and store information, operate our website, remember your preferences, deliver targeted ads and content, and enhance your experience. You can manage or change your cookie preferences at any time through your browser or device settings. To learn more, including how we collect, use, or disclose your information, please review our Privacy Policy and Terms of Use. By interacting with this cookie banner or accessing the site, you consent to our Privacy Policy and Terms of Use, including the arbitration provision and class action waiver.